|
|
|
|
|
|
|
|
|
|
|
Over the years, we’ve done a lot of work on Voyageur – actually, we do ALL of the work on Voyageur. She’s now in better-than-new condition. Here are some of our recent projects:
· Designed and built folding chart table · Designed and built hexagonal compass stand to accommodate our binnacle · Designed and built new forward hatch · Moved water and gas tanks to adjust trim and increase cockpit locker space · Replaced broken ribs · Rewired electrical system, installed new instrument panel · Refurbished cockpit sole, replaced cockpit sides · Rebuilt the (original) Gray Marine engine (1983) · Designed and sewed sail covers and cockpit tent · Installed new deck (1981) · Installed roller furling (2003) · Mast step apparatus (2004) · Windlass and anchoring system (2007)
|
|
New cabin top
(1989) Interior
refinishing & upgrades Cockpit (2001)
Deck (1981) DIY mast step (2004) |
Rib repairs
(2001) Engine
rebuild (1983)
Head &
plumbing Anchoring system (2007) |